Cinecyclop
← All articles

Lighting prep checklist, before the shoot

Between the first read and load-out, a lighting prep comes down to about fifteen decisions and a hundred lines of gear. Here is the order I take them in, and what I check at each stage.

ChecklistUpdated August 5, 2026

A prep that goes wrong rarely shows during prep. It shows on day one, when there is no stand for the fixture that was meant to hold the background, or when the line you thought was enough trips on the third unit.

This checklist follows the real order of the work: you do not pick fixtures before seeing the set, and you do not order cable before knowing what plugs into it. Every line carries the reason it exists, because a checklist you do not understand is one you tick without reading.

Order of a lighting prep Six stages in three phases: first understand the project and recce, ordering nothing; then choose fixtures, supports, power and control; finally check before sending the list. NOTHING ORDERED YET THE ORDER BEFORE SENDING 1 Read the project 2 Recce the locations 3 Choose the fixtures 4 Support and rigging 5 Power and DMX 6 Check and export what the recce turns up resizes the order The schedule trap It is still moving during prep. Date your version: half of all wrong orders come from an out-of-date schedule.
The first two stages cost nothing but time and drive everything else. Going back to them after ordering means redoing the order.
0 / 54

Tick as you go: your progress stays on this device, even if you close the page. Nothing is sent to a server.

1. Read and understand the project

Before any gear. What gets decided here drives everything else.

The trap. The schedule is still moving during prep. Date your version and note where it came from: half of all wrong orders come from an out-of-date schedule.

2. Recce

You only order well for a location you have seen, or failing that, measured.

3. Choose the fixtures

The visible part of the order. It is sized from the two previous stages, never from habit.

In Cinecyclop, the compatible items window offers the accessories made for each fixture as soon as you add it: grid, softbox, honeycomb, barndoors, chimera. It is the step that catches the most forgotten lines, because you know an accessory too well to think of writing it down.

4. Rigging, grip and support

Every fixture placed somewhere needs something to place it on. This is the most consistently underestimated position.

5. Power and distribution

The invisible part, the one that decides whether the day starts on time.

Rule of thumb. Add up the wattage, add thirty per cent, and compare with what the location can genuinely supply. If the two numbers are close, you need a generator.

6. Control and DMX

Handled during prep, not on the morning of the shoot.

Cinecyclop finds the controllable fixtures on the list, suggests a mode, packs them into 512-channel universes without ever splitting a unit across two universes, and exports a CSV that Blackout reads.

7. Consumables and small gear

The cheapest position on the order, and the one that wastes the most time when it is missing.

8. Before you send the list

The final pass. Ten minutes here is worth half a day on set.

In Cinecyclop, the Check & export step reads the list back and shows the missing essentials, the set rules, the abnormally low quantities and the compatibility pairs worth a second look. The report runs locally on the device.

This list is not gospel. A two-person documentary and a stage-based fiction do not tick the same lines, and that is fine. What matters is going through every position once, in this order, before sending anything.

The full process inside the app, from an empty project to the PDF you send, is described in the equipment list guide.

Frequently asked questions

When should a lighting prep start?

As soon as the schedule is stable and the locations are known. The first two stages, reading and the recce, involve ordering nothing at all: they set up everything else and mostly cost time.

How do I know whether I need a generator?

Add up the wattage of every fixture in the same location, add roughly thirty per cent of margin, and compare with what the location can genuinely supply. If the two numbers are close, plan for a generator: the peak draw always lands at the wrong moment.

How much gaffer tape should I order?

At least one roll per crew per week, more on exteriors or on sets that need a lot of fixing. It is the cheapest position on the order and one of the biggest time sinks when it runs out.

Does this checklist work for grip?

The rigging, support and consumables positions do. For a full grip order the logic stays the same: start from the location, pair a support with every item, then check access and weights.

One month to prepare a real list, fix it and export it. No card required.

Open the web app Discover Cinecyclop