Between the rental house and the set there is a truck, and something is always missing from it. Not because the rental house prepped badly: because nobody counted again while it was still easy.
This checklist gets ticked while loading, not afterwards. It assumes the list itself was already checked during prep: here you are controlling what physically goes into the truck.
1. On collection, before loading
Ten minutes here is worth a day on set.
2. Count and check condition
Open, count, power up. Always in that order.
3. Loading and strapping down
The truck moves. Anything not strapped down moves with it.
4. Paperwork and logistics
What does not get loaded but without which nothing moves.
5. The last pass
Two minutes, doors open, before closing up.
A load-out done properly goes unnoticed. That is exactly the point: nobody should have to think about the loading once they are on set.
To build the list that feeds this load, see the lighting prep checklist.
Frequently asked questions
Should every fixture be powered up on collection?
Yes, at least once each. A failing LED or a missing power supply shows in seconds at the warehouse and gets replaced on the spot. On set, the same fault costs you downtime.
In what order should a lighting truck be loaded?
In reverse order of unloading: whatever is needed first on set should come out of the truck last. Heavy gear goes low and against the walls, and everything is held by straps rather than by its own weight.
What should I do if the rental house substituted an item?
Have it noted on the prep sheet before you leave, and immediately check that the accessories follow. A near-equivalent model does not necessarily share its grids, softboxes or power supply.