Cinecyclop
← All articles

Load-out checklist

Load-out is the last moment where a mistake costs ten minutes instead of half a day. Here is what I check while loading, in the order the cases go in.

ChecklistUpdated August 5, 2026

Between the rental house and the set there is a truck, and something is always missing from it. Not because the rental house prepped badly: because nobody counted again while it was still easy.

This checklist gets ticked while loading, not afterwards. It assumes the list itself was already checked during prep: here you are controlling what physically goes into the truck.

0 / 32

Tick as you go: your progress stays on this device, even if you close the page. Nothing is sent to a server.

1. On collection, before loading

Ten minutes here is worth a day on set.

In Cinecyclop, the Rental check tool compares what you asked for against what was actually pulled, and lists the gaps.

2. Count and check condition

Open, count, power up. Always in that order.

3. Loading and strapping down

The truck moves. Anything not strapped down moves with it.

Loading order for a lighting truck Side view of a truck body. Heavy gear fills the bottom row, light gear the top row, and vertical straps hold it all. Blocks are numbered in loading order, the reverse of the unloading order. Load seen from the side unloading direction 1 2 3 4 5 6 light gear on top heavy low, against the walls vertical straps What is needed first on set comes out of the truck last.
Heavy low and against the walls, light on top, and a strap every two or three blocks. The numbers are the loading order: number 1 comes out last.

4. Paperwork and logistics

What does not get loaded but without which nothing moves.

5. The last pass

Two minutes, doors open, before closing up.

A load-out done properly goes unnoticed. That is exactly the point: nobody should have to think about the loading once they are on set.

To build the list that feeds this load, see the lighting prep checklist.

Frequently asked questions

Should every fixture be powered up on collection?

Yes, at least once each. A failing LED or a missing power supply shows in seconds at the warehouse and gets replaced on the spot. On set, the same fault costs you downtime.

In what order should a lighting truck be loaded?

In reverse order of unloading: whatever is needed first on set should come out of the truck last. Heavy gear goes low and against the walls, and everything is held by straps rather than by its own weight.

What should I do if the rental house substituted an item?

Have it noted on the prep sheet before you leave, and immediately check that the accessories follow. A near-equivalent model does not necessarily share its grids, softboxes or power supply.

One month to prepare a real list, fix it and export it. No card required.

Open the web app Discover Cinecyclop